Launch Date : Dec 2014
Launch Price : Rs. 6499 per sq ft
Construction Start Date : Dec 2014
Possession : Mar 2020
Total Land Area : 48.60 Acres
Number of Units : 2520
Number of Phases : 2
Phase Details : 5 towers in phase 1 and 2 towers in phase 2
Tower Details : Number of towers: 7
Floor Details : 32+Ground
Project Approval : BDA
Awards : Asia Pacific International Property Awards 2015
Furnished? : Unfurnished
Water Facility : BWSSB
Total Free Space : 70 percent
Sanction plan from: BDA
Sale Deed:
Khata Certificate and Khata Extract:
Bangalore Electricity Supply Company (BESCOM):
Bangalore Water Supply & Sewerage Board (BWSSB):
Booking Clause: 3 Lakhs
Swimming Pool
Toddler's Pool
Open Amphitheatre
Cricket Net
Children's Play Area
Basketball Court
Tennis
Pickup and Drop-off Point
Elegant Reception Lobby For Each Block
Club House
A Well Equipped Gymnasium
Gymnasium
Sewage Treatment Plant
StructureMain Door : 8 feet high opening with pre-moulded flush shutter and frame in wood, polished on both sides Toilet Door : 7 feet high with wooden frames and flush shutters Other Internal Door : 7 feet high with wooden frames and flush shutters Balcony Door : Aluminium/UPVC frames and sliding/openable shutters |
Flooring GeneralMain Lobbies : Granite/Marble Flooring Common Lobbies & Corridors : Vitrified Tile Flooring Staircases - Main entry level : Kota Stone flooring |
FlooringIndividual Unit Foyer, Living & Dining : Vitrified/Ceramic tiles flooring Master Bedroom : Vitrified/Ceramic tiles flooring Kitchen : Ceramic/Vitrified tiled flooring All Bedrooms : Vitrified/Ceramic tiles flooring Balconies & Utility : anti-skid ceramic tiles in balconies Toilets : Anti-skid ceramic tiles for flooring |
False CeilingFalse Ceiling will be prived in all the bathroom Attic or Storage or Utility : Utility Kitchen : Ceramic tile dado for 2 feet over a granite counter |
KitchenGranite counter and Sink |
ToiletsWash basin -Master Bedroom : Granite counter with ceramic wash basin Wash basin -Other Bedroom : Pedestal wash basins EWC's -Master Bedroom EWC's -Other Bedrooms |
PaintingInternal Walls & Ceilings : Distemper External finish : Textured paint / Cement paint MS Grilles & Railings : Enamel paint |
Toilets: CP Fittings & AccessoriesChromium Plated Fittings |
Electrical Outline Specification2 BHK Flat : 4KW 3 BHK Flat : 6.4KW 100% DG back up for lifts, pumps & common area lighting Modular Switches of reputed make |
AC PointsMaster Bedroom All other bedrooms &Â living room |
TV PointsLiving Master Bedroom All other Bedrooms |
Telephone PointsLiving Master Bedroom All other Bedrooms |
Price Range | 6981996 - 17893464 |
Price Per Sqft | 5799 - 6564 |
Booking Amount | 300000 - 750000 |
Floor rise Charges | 15 per sq ft |
Parking Charges | 300000 |
Maintenance deposit/Corpus /Sinking fund(Rs) | 45 per sq ft |
Bescom (Rs/sft) | 120 per sq ft |
Bwssb charges | 120 per sq ft |
Maintenance Charges (Rs/sft/ month) | 45 per sq ft |
Generator charges | 75000 - 150000 |
Khatha & Assessment charges | 20000 |